General Documents Readymade Garments Buyer
There are some documents should make ready for Readymade Garments Buyer for audit purpose like All License…….ok or not. All Buyer File………ok or not. Security Policy….ok or not. Sub Supplier Technical Audit Report….Need to be made in every 4 months. Daily Temperature check record………….Daily. Internal Technical audit………. Need to be made in every 4 months. Health checkup…….. Need to be made in every 4 months.Bolt Certificate………… Need to be made in every year. Application for accident…….If it is occurred then must send within 48 hours.
- Wastage Disposal Record…… Need to be made in every 15 days.
- Machine List……Need to update time to time.
- Sub Supplier Audit Report for Social Compliance……. Need to be made in every 4 months.
- Factory Profile…..ok
- Metal Contaminate Garments Disposal Record……. Need to be made in every 4 months.
- Lighting Check Report……. Need to be made in every month
- Group Insurance List……. Need to be made in every 02 months
- Internal fire safety Audit……. Need to be made in every month
- Reject Accessories Disposal……. Need to be made in every 6 months
- Fire safety Training Module…….ok
- Audit Schedule…….ok
- Health & safety Manual…..ok
- Calibration Certificate…….ok
- Injury root cause………ok
- Maternity Risk Analysis….. Need to be made in every month
- Investigation Record……ok
- Risk Analysis…… Need to be made in every month
- Internal social compliance Audit report………… Need to be made in every month.
- Certificates from buyer like H&M, Tesco, Li and Fung
Building Related Documents Readymade Garments Buyer
1. Building
Plan…..ok
2. Layout
Plan….ok
3. Structural
Design….ok
4. Soil
Test Report…..ok
5. Application
for Occupancy Certificate….ok
6. Construction
Certificate from engineer……ok
7. Construction
certificate from local authority……ok
8. Application
for building approval from Razuk……ok
9. Application
the BGMEA consider for fire requirement….ok
Fire Safety Readymade Garments Buyer
1. Fire
Drill….. Need to be made in every month.
2. Fire
Training (Internal)….. Need to be made in every month.
3. Fire
Fighter List with guide book….ok
4. Fire
Training Certificate by Bangladesh Fire Service & civil defense with
Application…..ok
5. Daily
Fire Reserve water tank checking record…ok
6. Smoke
detector, Fire alarm, Emergency Light & Exit Light check record….ok
7. Fire
Extinguisher inspection check record….ok
8. Daily
Fire training record for new workers…..ok
Standard Operating Procedure for Production Document Control
CUTTING
|
|||||
4.1 Fabric
relaxation record
|
|||||
4.2 Marker and
Spreading Checking Report
|
|||||
4.3 Daily Cut
panels and Bundling Checking Report
|
|||||
4.4 Part
Replacement
|
|||||
4.5 Fusing Machine
Temperature and Pressure Changing Report
|
|||||
4.6 Fusing Machine
Clean Repor
|
|||||
SEWING
|
||||||
5.1 Random No
Table
|
||||||
5.2 Random
Inspection Record
|
||||||
5.3 List of
Unclear Operators
|
||||||
5.4 Bundle Control
sheet
|
||||||
5.5 Sewing Quality
Inspection
5.6 Measurement
Chart Fit Audit
|
||||||
5.7 O Q L Summary
|
||||||
5.8 Sewing Cross
Audit Report
|
||||||
5.9 Weekly Root
Cause Analysis Chart
|
||||||
5.10 Sewing QC
Operator Counseling Report
|
||||||
WASHING
|
||||||
6.1 Washing
,Shade, and Hand Fill Checking Report
|
||||||
FINISHING
|
||
7.1 Finishing
Quality Inspection Report
|
||
7.2 Style/Line QL
Summary
|
||
7.3 Hourly Final
Audits Report
|
||
7.4 Measurement
Chart fit Audit
|
INTERNAL
|
||||||||
7.5 Inline/Final
Inspection Report
|
||||||||
7.6 Measurement
Chart fit Audit
|
||||||||
7.7 Internal
Auditor Report
|
||||||||
7.8 Weekly Root
Cause Analysis Chart
|
||||||||
7.9 Finishing QC,
Iron man and Folding Man Counseling
Report
|
||||||||
EXTERNAL
|
||||||||
8.1 Daily Summary
of Finishing Row Wise External Audit Report File
|
||||||||
8.2 Daily External
Cross Audit Report
|
Standard Operating Procedure for Samples and Files keeping and Disposal
Objective:This procedure is to ensure that
samples, pattern and files will be kept in proper and accessible place. Will be
disposed in exact time and
Responsibilities and authorities:Concerned
merchandiser for keeping the sample and files.
- Merchandisers , pattern masters, cutting man for keeping the hard patterns
- Merchandisers and pattern masters for keeping the soft copy of patterns
Procedure for keeping the samples & files:
1/
In merchandising section, cabinet / cupboards has been divided separately for for files and samples.
2/ Merchandising
section have been divided into teams, so both sides of the department have
cabinets for each team so that it can be accessible anytime.
3/ Development / new
samples keep in separate rack.
4/ File organizing will
be as follows:
a/
Each style will have one master file including tech pack, trims, fabric
consumption / markers, fabric and garment test reports and all important
mails pertaining to the styles like approvals, changes or any issues
regardless if its from buyer, hk office or even internal communications.
b/
There will be a separate file for trims since this is big area. From trim chart of each orders
(retail and catalog), inventory reports and bulk trims shipment invoices /
packing list for imported items.
c/
Separate file also has been maintained for local trims. It includes ordering
sheet of hanger, carton, poly bag, thread and monitoring file.
d/
Files will be kept buyer / account wise in each filling cabinet. There is
cabinet allocated for currently running styles. It should be kept together.
5/ Sample keeping /
organizing
a/ New and running styles red tag samples has to be
hanged together
b/ Old styles red tag samples folded and kept separately.
c/
Two years old samples will be kept inside the box and will be labeled “ red tag
samples for particular season.
Procedure for disposing the samples & files
1/ Files are being kept
in merchandising section for 2 years
2/ Soft copy are being
maintained and emails is stored in MIS section.
3/ Files as well as the filling folder will be
re-used in new upcoming style.
4/ Red tag / size set
samples are being kept for 2 seasons at least in cupboard.
5/ After 2 season,
these samples will be folded and keep inside carton then pile in merchandising
stock room. Carton will be marked with style numbers and season.
6/ Once stock room is
filled, will select those cartons as per the date / season, cut the samples
into pieces then send for disposal. Trims like hangtags and labels attached on
the samples has be removed before final disposal.
7/ All rejected garments will be reviewed and
checked if repairable or any
alteration can be done to reduce the rejection.
Rejected garments will be transferred to stores with
proper record and will be
cut
into pieces for final disposal.