What is Fabric Requirement Construction & Wash Procedure

Fabric Requirement Construction

Prepared Leg mocks (minimum-5) and develop the wash as/std., after achieve the final wash a sample leg mock submit to customer/Buyer . Need to use similar thickness yarn during knitting process run...
  • Yarn should be handle in a correct manner to avoid fiber breaking up also good length fiber need to be select for yarn manufacturing. (Final wash recipe should be attached with leg mock ) 
  • properly adjust the bar tack machine and avoid  the pressure.  6. Educating the operators for self  stitching stage. After rcvd the comments and approval on leg mock gmts need to wash using actual fabric.
  • If gmts not as/std. need to call out buyer 
  • All the instrument around working place should be smooth surface. Bulk washing technique and Wash Procedure 
  • Bulk production Fabric Construction to use for gmts samples and FPT & GPT test conduct for all the colors . 
  • Based on wash comments Wash Procedure and submit the sample/Leg mock to buyer/Buyer for approvals. more careful  while doing stitches  use  needle size  . 8. properly  follow  recipe and temperature  washing stage.
  • Leg mocks/Gmts submitted to buyers for approval keep in Buyer Office (attached wash recipe with nwashed Fabric Construction  swatch 
    Fabric Requirement Construction & Wash Procedure
  • PP Meeting -Merchant team will arrange pp meeting with fcty ,QC/QA wash team, & discus all critical points & buyers comments. PP sample must seal than hand over to fcty /QA team for production. 
  • Fabric or garment  need to handle very care fully. Fabric Construction control
  • Before bulk gmts production shade blanket need to wash as per approved buyers washing std. , shade report send to all the concern deptt. for bulk gmt production 
  • Based on PP comments production size set nee to wash (should be wash in all the colors) & report submit to Buyer office 
  • Avoid  Needle  feed pressure stitching stage . properly Adjust the machine thread tension. .Adjust machine tension and properly  handling Qc will send garments for testing to Buyer Lab.
  • Based on size set comments pilot production/shade range need to wash ( minimum 2 lots need to wash for shade range ) . 
  • Risk analysis and product reengineering  on proto stage . Bulk wash Approval
  • Based on PP/Wash reff. comments review wash range & send to buyers/Buyer for approval copy of washed counter Keep with counter seal 
  • After rcvd comments approved shade garments need to seal and send to fcty for production and copy of all approved gmts need to keep in Buyer office
  • Bulk wash gmts must Wash Procedure as per lot size & shade wise all the bulk wash should be meet with color , handfeel,abrasion and the dry process standard and consistent throughout the bulk production of fabric construction Requirement 

Share :

Facebook Twitter Google+ LinkedIn

About Author:

He is top ranked RMG Digital Marketing Consultant. He is Open Source Software Implementation Expert. He is certified professional from NCC, Aptech and New Horizons .Completed B.Sc.and M.Sc.in Software Engineering from London Metropolitan University. You can Hire Him.


Contact:Cell#+8801792525354 Email:apparelsoftware@gmail.com
0 Comments on "What is Fabric Requirement Construction & Wash Procedure "

Back To Top