We Offer Free Garment ERP and Consultency on Compliance

Deputy Manager Finishing Job Description

Deputy Manager Finishing Job

Finishing Job Description Make a good plan to finish the dyed fabric by considering urgency, smooth running of production line as well as fabric nature discussing with senior production manager. Need to ensure Trimming and buttoning quality as per the Buyers standard ...
..
Deputy Manager Finishing Job Description

Job title : dy. Manager location : factory

Department : finishing reports to: Senior Dyeing Manager (prodn)

Coordinating department: internal : dyeing, quality control, maintenance, store section.

External : artkwl

Immediate superior : sr.manager (production)

Immediate subordinate : Assistant Dyeing Manager / junior manager.

No. Of employee supervised : 073

Finishing Job Description & summary :

  • Need to educate subordinates according to the buyers standards. Drive the subordinate to implement that plan.
  • Take preventive action for making nonconformance product.
  • Need to maintain proper house keeping andcleanliness in the section. Take corrective action for nonconformance product.
  • Set the parameter of different finishing machine as per senior production manager/ general manager’s instruction.
  • Need to report relevant dept heads , If not receiving garments in correct condition and according to bundle card. Finishing of fabric according to plan.
  • Overall follow up of finishing, whether the machine is running according to instructed parameter or not?
  • Need to check hourly production and keep record. Drive the subordinate to implement that plan.
  • Need to maintain record for button pulled testing and pinch setting Take care of unloading trolley, so that dyeing can unload fabric without any delay.
  • Coordination bet quality control section and finishing section for any kind of fault is generating during processing. Need to return the garments after wash according to bundle card
  • Finishing Job Description Set the parameter of different finishing machine as per senior production manager/ general manager’s instruction.
  • Accountability : he is acconutable to senior production manager in all respects of finishing like shrinkage, spirality, width, gsm etc.

Check List

If any pressing shrinkage fty needs to update cutting dept on the additional shrinkage for pattern adjustment. RD- inline inspection report.
  • Folding / Packing approval / carton dimensions to be set.
  • Follow up Bulk production:
  • Daily QC report has to up date by same day
  • Follow up the factory daily report
  • RD-pre final inspection report
  • Final inspection:
  • Factory should send final inspection notification to Asmara 02 days prior to the final inspection.
  • Finishing Job Description Merchant &QA dept should hv the complete packing listed the time QC manager goes to fty for final inspection.
  • Relase the inspection completed goods:
  • Up date the commercial & Merchandiser
  • Production up date report
  • RD- daily production updates
  • Consumption approval for bulk
  • Need to keep records of defects % and inform relevant responsible persons. Need to do any other job assigned by management.
  • Follow up the pressing as buyer needed
  • Verify pressing shrinkage
  • If TOP /meeting sample are needed then follow up submission of sample
  • Asmara qc must evaluate the Top before sending to customer. Sample s/be sent to Asmara with completed sample evaluation sheet + the measurement reports
  • QC has to verify the smallest size carton & biggest size carton for weight , packing method, & ctn marking verification.
  • In line inspection:
  • Must conduct minimum 2 in line inspections for 1000 pcs
  • 1000pcs to 3000 pcs 3 inline
  • 3000pcs to 5000 pcs 5inline
  • Additional every 5000pcs need to add 02 more inline inspections.
  • Inline has to covered pack garments as well.
  • Inline inspection must covered all colors & all sizes.
  • QC has to check bulk for every aspect of washing.
  • RD-inline inspection report
  • Pre final inspection:
  • Daily pack qty to be audited by the fty QA, Asmara QC’s responsibility is to correlate the audit findings
  • After 50% completed Asmara qc need to conduct pre final inspection
  • Need to follow AQL 1.5 for the pre final audit. AQL will be varied base on the buyers QA standard.

Share :

Facebook Twitter Google+ LinkedIn

About Author:

He is top ranked RMG Digital Marketing Consultant. He is Open Source Software Implementation Expert. He is certified professional from NCC, Aptech and New Horizons .Completed B.Sc.and M.Sc.in Software Engineering from London Metropolitan University. You can Hire Him.


Contact:Cell#+8801792525354 Email:apparelsoftware@gmail.com
0 Comments on "Deputy Manager Finishing Job Description"

Back To Top